Lifecycle notice

IBM i 7.4 standard support ended on 30 September 2026.IBM i 7.4 standard support has ended. Plan your upgrade

IBM i 7.4 Service Extension ends on 30 September 2029.IBM i 7.4 Service Extension ends Sep 2029. Plan your upgrade

RHEL 7 Extended Life Cycle Support ends on 31 May 2029.RHEL 7 extended support ends May 2029. Review your Linux estateReview your estate

Automation opportunity assessment

A structured look at the infrastructure work your team repeats, ranked by time, risk and ease of automation, with a practical plan for the first set of tasks.

Who it is for

  • Infrastructure teams with growing workloads and the same headcount
  • Organisations starting with Ansible, or with scattered scripts to consolidate
  • Managers who need a business case for automation

What we examine

  • Which tasks consume the most engineer time
  • Where manual work causes errors or delays
  • Existing scripts and tools worth keeping
  • The controls needed around who can run automation
  • The skills and practices needed to sustain it

Typical scope

  • Interviews with engineers and service owners
  • Change, incident and request records reviewed for repeated work
  • Existing scripts and automation
  • Platform options, including Red Hat Ansible Automation Platform

What you receive

  • A ranked list of automation candidates with estimated effort and benefit
  • A recommended platform and operating model
  • A first-phase plan your team can start on
  • A findings workshop with your team

What we need from you

  • Time with three to six engineers and service owners
  • An export of recent change and request records, if available
  • Access to existing scripts or automation repositories

How it runs

  1. Scoping callWe confirm objectives, the systems in scope, access and timing, then agree scope and any fees in writing.
  2. Information gatheringWe interview engineers and service owners and review change and request records for work that repeats.
  3. AnalysisWe estimate effort and benefit for each candidate and rank them, taking risk and dependencies into account.
  4. Findings workshopWe walk your team through what we found, the options and the trade-offs, and answer questions.
  5. Report and roadmapYou receive the written report and a recommended roadmap. What happens next is your decision.

Where this assessment leads

The same patching change done by hand and with Ansible automation
StepBy handWith Ansible
Approve the change Change raised and approved, then steps copied from a document Approved job template linked to the change record
Apply updates An engineer logs in to each server in turn Runs across all target servers in controlled batches
Check the result Spot checks, as time allows Checks built into the playbook stop a bad batch
Record evidence Screenshots and notes gathered afterwards Job output and who ran it kept automatically
Next time Depends on who does it Runs the same way every time

Request the automation opportunity assessment

Tell us about your environment. We will reply to arrange a scoping call and then send a written proposal.

What happens next

  1. We reply by emailA specialist reads your enquiry and replies to arrange a time to talk.
  2. Discovery callWe talk through your environment, constraints and goals.
  3. Written proposalScope, deliverables, timing and fees, for you to accept or change.

Prefer to write directly? info@code24.com.au or call +61 411 540 099

For example: how many systems, which releases, and what prompted the review.

We will reply by email to arrange a time to talk.